Sunday, July 17, 2011

Bathroom: Plumbing problems...

Destruction Ends, Construction begins! A couple days into demolition, I decided I should shut off the water to the bathroom and after hunting around in the basement, I found two valves on the copper supply lines running straight up to the bathroom. Perfect! I can keep the rest of the water on while I work on bathroom plumbing. But then, as I started twisting one of the valves closed, it literally sprayed water on me and soon there was a puddle on the basement floor. The leak stopped completely when I opened the valve fully. Then, in the same moment, I noticed a few drips hanging under the insulation on a pipe nearby, and was horrified to discover underneath the insulation that the pipe had a rusty section wrapped in electrical tape and was leaking, probably about to burst. It was the only steel piping left in the house and supplied the outdoor faucet (which also leaks, a lot), upstairs bathroom, and washing machine (which has leaky valves, too!).

I eased myself into plumbing by first buying a few Shark Bite fittings and valves (easy but costly push-together system) and replaced about 40 feet of steel pipe in the basement, but realized I couldn't do the whole job with Shark Bite or I'd add a couple hundred bucks on right there, so I sat down and watched, yet again, more YouTube "how to" videos and taught myself how to sweat copper pipes. Here's a partially-pictured list of the plumbing I had to re-do:

1. supply lines to outdoor faucet and washing machine; new valves for bathroom supply lines (I used pex pipe for this, works great)

2. washing machine faucet and sink hook-ups (see above, new PEX piping and a Sharkbite shut-off valve to replace the old, nearly bursting steel pipe, and then I used (much cheaper) copper for all the joints and valves for the sink and washing machine).

3. tapped into a gas line for our (used, old) gas dryer which required about 5 threaded fittings. For this, I had to buy a big, hefty pipe wrench, a tool I didn't understand prior to this job. I'm glad I didn't attempt it without a pipe wrench. I tested all the fittings with soap to look for bubbles.

4. drains for sink and tub

5. toilet supply line

6. new main valve for shower**

Once I got the new valves in the basement for the bathroom supply lines, I was able to shut them off and isolate the bathroom so I could tinker on it. Total time with the main water shut off for the whole project: only TWO hours!! **Number 6 was a huge test of patience and confidence. It involved some 15 plus sweated copper joints, one of which leaked when I tested the system, right at the connection to the new main valve. A slow drip, maybe once every 10 seconds, but enough to make me almost give up entirely. A simple YouTube search just wasn't helping this time. I should've called someone. Out of frustration and desperation, I cut through the pipe next to the leak, grabbed the pipe with my biggest set of pliers, and, to my surprise, was able to crush/muscle it out of its fitting without messing up the valve box nor the other joints on it. An hour later and 5 new sweated joints, and I was done with all of the plumbing - for now. I will probably replace the powder room's sink at some point, and I still have to run a line to the fridge which I've now learned is a simple $20, 1-2 hour task. (the previous owner I guess decided it wasn't worth it? to buy a new fridge with an ice machine and filtered water, but not hook it up??)

It's an empowering thing to realize I now understand and know the location of all of the plumbing and gas lines in the house, and am confident I could fix whatever problems may arise - it's the ACCESS to that problem that presents the biggest challenge, and identifying exactly what's leaking or failing because it's hidden can be a nightmare. I can't wait to live in a house that is plumbed entirely with PEX piping (like PVC but flexible and more durable) as many new houses are! My biggest worry: hoping the drains in the new bathroom will function fine despite having just about the minimum slope required (1/4" drop per 1 foot horizontal).

Next up: Construction - The Bathtub

Bathroom: The Excavation


Heather wanted me to tell the bathroom story since I'm the one doing it. Pardon my wordiness - it's also the family journal!

Planning: During our last couple of months in Spokane, we watched more than a few episodes of HGTV network shows online. Inspired, I decided we could take on a "small" project and, since the bathroom is one of the smallest rooms in the house, I decided it would be a good first project. I had about a week off between jobs. I grabbed my brother Dave's tile wet saw when climbing Mt. Hood with him in May. On our drive East, we picked up a bathroom design book and started picking out things we liked.
just getting started...


Demolition: Two days after arriving here, we went to Home Depot and spent nearly $500 on tools, such as a crow bar, cordless drill and saw, a miter box saw, a few cold chisels, wood chisels, some orange buckets, a laser level (yep, I know, a splurge but it's been so, so nice!), and a shop vac.

Megan Hay, Heather's 10-year-old niece, helped with the first phase of demolition: removing some cheap stick-on 12" square linoleum tiles. They were actually brand new. I absolutely loathe such cheap flooring. Well, it wouldn't have been that bad except it was a boring gray with an artificial-looking print, and there were small gaps here and there where it didn't come together all that well. They were amazingly, stubbornly sticky too.

There's something very empowering and exciting about beginning the demolition - it's the point of no return. Not trivial in this case, as it was a fully functioning full bath (the only in our house) and it had a new floor in it. Unlike a fellow co-worker who re-did his bathroom because an old pipe started leaking behind the tile wall, we chose to deprive ourselves of the most essential room in the house. Once we start destroying, there's no fixing it, pressing CTRL + Z, or starting over... BUT... the history of an 80-year-old house unfolds itself with all its ugly and quirky secrets (and the scope of the project) into plain view.

After about 10 tiles, we gave up as they were tearing into pieces instead of lifting off whole. Megan left, and I grabbed the crowbar to pry up the 1/4" plywood under the linoleum tiling, and discovered that it was adhered to an old 1" square tile floor with an excessive amount of glue. I excitedly chipped off some of that tile, revealing an old, white 1" hexagonal tile floor laid in cement. I kinda liked the stuff, but the cement discovery was a HUGE setback.
discovering the original tile floor

Do I carefully demolish down to the 1" hex tile floor? Somewhere during a frenzy of tile-smashing, tub bashing, and vanity crashing, I stepped a little too far beyond the point of no return as a few large chunks of cement came loose and I excitedly pried them up out of the floor. The cement was 5-6" thick, with a heavy wire mesh embedded halfway through, poured onto a layer of support boards made of various scraps of wood (this wood was an exciting discovery as it revealed that the exterior is thick cedar shakes hidden under the insulated aluminum siding we have now).

During the floor demolition, I did run down the stairs more than ten times to verify that the lath-and-plaster ceiling below the bathroom was still intact. I dropped tools, boards, cement, and discovered Brennan walking right on the lath, but it held up! Well into the 2nd full day of demolition, I had the sudden revelation that I should rent a jack hammer, which saved my back and probably a full day's work. I was done breaking up the floor in about an hour with that thing. But it took me many hours afterwords and at least a hundred trips up and down the stairs, to haul out literally tons of concrete chunks, concrete bits, concrete dust, tile, piles of wood, the PINK cast iron tub (smashed into chunks with a sledge hammer), two PINK cast iron sinks, the PINK toilet, and the mirror and vanity.

Heather tackled the waste handling problem by calling our garbage company and discovering they'd haul away the equivalent of 18 bags of trash in one pick-up. Much to our suprise, they also hauled away ALL of the concrete. The garbage truck was parked in front of our house for a solid half hour while they loaded it up. And the cast iron and toilet literally vanished to the scavengers as quickly as I could bring them to the street (we do live on a somewhat busy road).

Some more discoveries during demolition: (1) The first major bathroom renovation occurred in 1968 (I found some newspaper and carefully unwrinkled it - I should post some pieces of the grocery ads...). (2) All of the steel pipe, both the drain pipes and water supply, had at some point been replaced with copper - and all the old steel pipes left embedded in the concrete made for excellent leveraging material when removing the concrete once I realized they were no longer needed. (3) The area of the tub had settled over 1 inch relative to the highest point in the room, which happens to be where the sewer stack sits, which means the sink drains and the bathtub drains now had to fight that 1 inch of elevation difference to get to the sewer stack - this is not an insignificant discovery. I considered at length re-routing the drains down a channel where the supply pipes ran, straight to the basement, but ultimately decided against it because I didn't like the idea of weakening up the floor joists any more than they already were. The original plumbing was run in such a way to preserve the joists' strength but the copper re-do was accomplished by cutting out large sections of the joists, right down the center of the floor, over halfway through in some spots!
Demolition complete (and a new bathtub drain). Check out those chunks of concrete that our awesome new garbage service took away for us!

Next up: Plumbing Problems...

Saturday, July 16, 2011

Trevor - 4 months old





Trevor had his 4 month old check up on Thursday. He's a healthy growing boy. He weights 16 pounds 1 ounce (75th%) and is 25.25" long (70%). He sure is getting big. He's such a happy easy going boy.

He loves to watch Brennan play. Brennan loves to show Trevor his tricks as well. I love when Brennan talks to Trevor because Trevor is really starting to notice Brennan. Trevor eyes follow Brennan around the room. Brennan can even get Trevor to smile big when he jumps in front of him. I think if Brennan doesn't start growing soon Trevor will catch up to him!
(this is Trevor just over 3 months old - I haven't been very good at taking pictures during this move/unpacking/etc).

** Today I was sewing and Trevor was playing under his toy blanket (mobile). I turned around to check on him and he was on his belly! He's been working on that for a while and has been so close. His arm was still stuck under his belly, but he was fully extended looking up. I was quite impressed! He has yet to master rolling from belly to back - which usually comes first. He has rolled from belly to back a few times, but it was too soon after I placed him on his belly for me to count it. I think it was still his head momentum from me turning him.

Friday, July 15, 2011

Brennan and Sleeping

About a week ago I was running some errands and left Logan to help the boys get to bed. While I was gone Logan said Brennan got out of his bed and came downstairs asking for a drink of "water and milk". Logan gave him a drink and asked him to go and get back in bed. Brennan left the kitchen and Logan went back to work doing what he was doing. A while later Logan heard a loud noise on the stairs. He went to see Brennan at the bottom of some stairs sleeping. Instead of going back to bed in his crib (yes, I know, he's still in his crib - when the bathroom is done he'll be in a twin bed in a different room) he went and laid on one of the stairs. He had fallen asleep and rolled down the stairs! The funny thing is when he fell it didn't even wake him up. Funny kid. He had asked me earlier that day if he could sleep on the stairs and of course I said no. I guess he wanted to try it out on his own.

A funny thing about our new home

Yesterday was quiet funny in our house. 3 or 4 times I found Brennan crying randomly while I was doing something in another room. I asked him why and he said, "I couldn't find you." So cute and innocent. I guess he's not used to looking for me in 3 floors (basement, downstairs, and upstairs). Good thing he doesn't know we have a full attic ;) (it's not finished yet - we're thinking about doing it in a year or two if time and money come together).

Monday, July 11, 2011

Dance Family photo's

While we were in Bellevue, for Jacob's return off his mission, we had some family pictures taken. It was the first time in 2 years the whole Dance family was together. We took some pictures as a whole, just the grand kids, and then some individual family pictures. We now have a family picture with Trevor in that we can print and hang on our wall. We think they turned out great!
Grandkids

The whole gang.

Our family of four

Logan and siblings

Sunday, July 10, 2011

New House - front room, stairs, den, and entry way

Walking in from the front door. There's a front door, small mud room, and then another door to enter the house. You can see the kitchen through the doorway on the right.

Looking down from the front stairs. You can see the mud room and two doors. You can also see the french doors to the right of the front door.

Above - View into the front room from the french doors. The door to the right goes into my sewing room. The window on the far left also goes into the sewing room.

French door to the right. Large front window.

Front room. The front door is to the left of the french doors. The right door frame takes you to the side door, kitchen, and den (pictured later in this post). This picture is taken looking out of my sewing room.

Stair landing. The left takes you to the front door and the right takes you into the den. The den (well, really a dining room from the original house plans). I love this little side stair case and use it all the time. Brennan loves to play on it as well.

Looking into the den from the front room.